"Not only was our hospital completed on time and under budget, but the entire experience was exceptionally well-orchestrated and trouble-free. Without exception, the [Gaylor] team was efficient, flexible, and incredibly easy to work with."

- OSU Wexner Hospital

OSU Wexner Hospital

Columbus, Ohio

Ohio State University
E
Gaylor Electric digitally modeled the installation and coordination of the electric drawings for the hospital. The pre-existing facility was renovated by adding a 21 story, state-of-the-art Cancer Research Center, on The Ohio State University campus.
E
Gaylor Electric provided progressive engineering, constructability reviews, specifications, and code reviews of the various systems and equipment used in the preconstruction phase of the project.
E
Following the preconstruction phase, Gaylor Electric‘s certified team members installed complete lighting and control systems, including: lightning protection, fire alarms, emergency, critical, and life systems, and safety power distribution.

Award Winner

Build Type

Design-Assist

Project Size

1,500,000 SF