"Not only was our Alumni Center completed on time and under budget, but the entire experience was exceptionally well orchestrated and trouble free."

- DePauw Alumni Center

DePauw Alumni Center

Greencastle, Indiana

E
The work at DePauw began with the internal demolition of the existing house, in combination with an expansion/buildout. For the electrical team, plaster walls in the existing facility were very difficult to work with. Behind every plaster wall a support layer of old lattice had to be penetrated in order to install the conduit and rough ins.
E
In close proximity to the DePauw student population, our electrical team was able to stay on schedule and keep everyone safe throughout the build. This was made possible by breaking down the alumni center into manageable portions of installation work packages, to assure that all materials, information, tools, and equipment were in the right place at the right time.
E
The execution of the DePauw Alumni Center blended Safety, Quality and Production while providing real value to DePauw University’s alumni association, student body, and future scholars. By capitalizing on preplanning and coordination our team was able to deliver a breathtaking final product.

Award Winner

Build Type

Design-Assist

Project Size

50,000 SF